Follow operating facilities and proposed developments in one project view. Korzy combines public data-center sources while retaining the evidence behind locations, project stages and reported power figures.
Dated milestones and reported status history where available; depth varies by project.
Observation frequency
Weekly refresh; events are reported irregularly.
Reporting lag
Varies by project and publication.
Inventory checked
2026-09-23. Coverage dates describe this checked inventory.
Ashburn, Virginia · Power infrastructure for data center site research.
What's in this dataset
Project and organization
Names, aliases, reported operators and source-specific organization roles.
Development stage
Operating, partially operating, construction, permitted, proposed, cancelled or unknown status.
Power claims
IT load, facility power, planned phases and estimates retain their own basis, date and source.
Location evidence
Coordinates, location precision, linked footprints, references and possible matches.
About this data
Are nearby records automatically treated as one campus?+
No. Supported identity matches are merged conservatively. Uncertain matches remain visible, and proximity alone does not prove that two buildings belong to one project.
Can I compare every reported megawatt figure directly?+
IT load, total facility power and planned campus capacity describe different things. Each claim keeps its definition and stage so the comparison can use an appropriate basis.