New York grid transfer capability

Review published transfer limits between New York electricity interfaces. The time-series view preserves market and interval distinctions so regional transfer conditions can be examined alongside grid infrastructure.

Sign up

Part of Power & Energy

Power plants and transmission routes around Limerick, Pennsylvania, with the plant's reported generation capacity
Limerick, Pennsylvania · Power generation and transmission context.

What's in this dataset

Interface
Published regional interface name.
ATC and TTC
Available and total transfer capability measures retain the source units and values.
Market and interval
Day-ahead and hour-ahead reports remain separate.
Local time
New York reporting time, with repeated clock-change hours distinguished.

About this data

Is interface ATC a parcel's available power?

No. Interface capability concerns transfers across a defined part of the regional system. A parcel connection and local utility load capacity require a separate assessment.

How are missing intervals shown?

Unpublished values remain gaps. The service does not convert missing observations to zero or invent a time-zone offset absent from the source report.

Get early access

Sign up for Korzy release updates. Tell us a little about yourself and what you're working on so we can reach out.